This one-hundred-and-third volume of the IARC Monographs contains evaluations of the carcinogenic hazard to humans of bitumens and bitumen emissions and of some N- and S-heterocyclic polycyclic aromatic hydrocarbons (referred to as azaarenes and thiaarenes respectively). This volume is the fourth in a series of IARC Monograph volumes evaluating exposures related to air pollution. Indeed the IARC Monographs Advisory Group that met in 2004 recommended that IARC develop such series in recognition of the large contribution of air pollution to the global burden of cancer. Agents and related exposures evaluated thus far according to this recommendation include nonheterocyclic polycyclic aromatic hydrocarbons in Volume 92 (IARC 2010a); particles and fibres in Volume 93 (IARC 2010b) and indoor air pollution in Volumes 95 and 100E (IARC 2010c 2012). This Monograph concerns only bitumens produced by petroleum refining and not naturally occurring bitumens. Thus the term bitumens as used in this volume refers to the products derived from residues resulting from vacuum distillation of selected petroleum crude oils.
These materials are called asphalt petroleum asphalt or asphalt cement in North America; in this volume the term asphalt is used to describe mixtures of bitumen and mineral matter. Bitumens must be distinguished from coal tars which are products of the destructive distillation of coals and also from coal-tar pitches which are residues from the distillation of coal tars.
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: