Archaeological works conducted during construction of the Chalgrove to East Ilsley gas pipeline identified two large and thirty-two small sites. These were predominantly late prehistoric in date, with Iron Age deposits being the most abundant. A small amount of Neolithic and Bronze Age activity was recorded, and a single Saxon site was found. Very little Roman activity was encountered outside the two main sites. No medieval and only one postmedieval site was encountered, although many undated ditches and pits recorded during the watching brief were probably from these periods. The largest archaeological site encompassed three or four separate settlement areas. The second largest site appears to have been a single enclosed settlement, probably a farmstead, established in the early Iron Age and occupied until the early Roman period. The watching brief located sixteen datable smaller sites and a further sixteen sites containing only undateable features. The earliest features discovered were two early Neolithic pits. An earlier Bronze Age burial, probably a barrow, was found. The Roman road from Dorchester-on-Thames to Silchester was located. A single high status Saxon burial was discovered. One site contained 17th to 19th century domestic structures. Medieval or post-medieval furrows and field boundaries were identified at eight sites.
- ISBN:
- 9781407303246
- 9781407303246
-
Category:
- Ancient history: to c 500 CE
- Format:
- Paperback
- Publication Date:
-
15-12-2008
- Language:
- English
- Publisher:
- British Archaeological Reports Limited
- Country of origin:
- United Kingdom
- Dimensions (mm):
- 297x210mm
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: