The purpose of this research paper is to try to clarify and evaluate the major issues and arguments in the debate on Import Substitution Industrialization Strategy (ISI) between the neoclassical economists and the development economists. In particular, it will focus on some basic underlying models employed by the two schools of thought, rather than on specific policy recommendations given by either school. It will conclude that the critiques against ISI from the neoclassical economists are based on a static equilibrium model, which can not fully comprehend the dynamic relationship between growth and ISI at a macroeconomic level.
This paper starts by examining the historical background and formative influences of ISI, then goes on to compare and contrast the structuralist rationales for ISI and neoclassical rationales against it. The conclusion I reached is that the fundamental rationales behind ISI-- the infant industry argument, external economies and linkages effects--remain intellectually valid. The issue of terms of trade has important relevance to development economics but should be studied in a different context.
The general conclusion of this paper is that import substitution as an industrialization strategy remains viable and may be of great importance or less developed countries that want to catch up economically with industrialized countries.
- ISBN:
- 9781581120073
- 9781581120073
-
Category:
- International trade
- Format:
- Paperback
- Publication Date:
-
01-12-1997
- Publisher:
- Dissertation.com
- Country of origin:
- United States
- Pages:
- 108
- Dimensions (mm):
- 216x140x7mm
- Weight:
- 0.14kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: