6 3/4 X 9 3/5 in MIX DESIGN: Review of methods and philosophies; mix design for special p urposes
SPECIAL CONCRETES: Lightweight concre te; autoclaved aerated concrete, no-fines concrete, lightweight aggregat e concrete and foamed concrete; High strength concrete; Refractory concr ete; High density and radiation-shielding concrete; Polymer concrete; Fi bre-reinforced concrete; Mortars; renders; Recycled concrete
SPECIAL PROCESSES AND TECHNOLOGY FOR PARTICULAR TYPES OF STRUCTURE: Sprayed concrete; Underwater concrete; Grouts, grouting and grouted concrete; Mass concrete; Slipform construction; Pumped concrete; Concrete for liquid retaining structures; Vacuum process; Concrete coat ings and surface treatments
READY-MIXED CONCR ETE: Types of plant; truck-mixer efficiency; effects of prolonged agitat ion; quality control; acceptance and compliance
EXPOSED CONCRETE FINISHES: Types of surface finish; methods of produc tion; weathering
REPAIRING CONCRETE: Diagnosi s, materials and techniques.
FORMWORK: Princi
- ISBN:
- 9780750651059
- 9780750651059
-
Category:
- Building construction & materials
- Format:
- Hardback
- Publication Date:
-
30-10-2003
- Language:
- English
- Publisher:
- Elsevier Science & Technology
- Country of origin:
- United Kingdom
- Pages:
- 704
- Dimensions (mm):
- 244x171x39mm
- Weight:
- 1.34kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: