Many structures in chemical plants, refineries, and power generation plants operate at elevated temperatures where creep and rupture are a design consideration. At such elevated temperatures, the material tends to undergo gradual strain with time, which could eventually lead to failure. Thus, the design of such components must take into consideration the creep and rupture of the material. Analysis of ASME Boiler, Pressure Vessel, And Nuclear Components in the Creep Range introduces the general principles of design at elevated temperatures with extensive references cited for further in-depth understanding of the subject. Each chapter has been updated and a new chapter covering on Creep Analysis - Remaining Life Method (discussing the requirements of ASME Code FFS-1) has also been included. Numerous examples are included to illustrate the practical application of the design and analysis methods presented. The design approaches illustrated in this book are based on the experience of the authors over the past 40 years, and the methodology shown in the book will help the engineer accomplish a safe and economical design for boiler and pressure vessel components operating at high temperatures where creep is a consideration.
- ISBN:
- 9781119679462
- 9781119679462
-
Category:
- Mechanical engineering & materials
- Format:
- Hardback
- Publication Date:
-
04-10-2022
- Language:
- English
- Publisher:
- John\Wiley#& Sons, Incorporated
- Country of origin:
- United States
- Edition:
- 2nd Edition
- Dimensions (mm):
- 231.1x149.9x30.5mm
- Weight:
- 0.66kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: