The design and operational requirements of nuclear facilities, such as nuclear power plants (NPPs), are specified and managed to ensure the safety and optimized operation of the facility. These requirements and how they are managed, interpreted and used to support facility functions and activities, are very important in all the life cycle phases of the facility from design through construction, commissioning, operation, and from refurbishment to decommissioning. This publication analyses and provides new insights into the different approaches followed by the nuclear industry for their effective management as well as guidance to develop a comprehensive requirement management programme in nuclear facilities. Although the guidance provided is based on industry experience to develop such programmes for NPPs, the principles and approaches provided can be used in all nuclear facilities including research reactors, fuel manufacturing facilities, fuel reprocessing and waste management facilities.
- ISBN:
- 9789201261205
- 9789201261205
-
Category:
- Nuclear power industries
- Format:
- Paperback
- Publication Date:
-
28-02-2021
- Publisher:
- IAEA
- Country of origin:
- Austria
- Pages:
- 90
- Weight:
- 0.26kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: