On a global scale, sewage represents the main point-source of water pollution and is also the predominant source of nitrogen contamination in urban regions. The present research is focused on the study of the main challenges that need to be addressed in order to achieve a successful inorganic nitrogen post-treatment of anaerobic effluents in the mainstream. The post-treatment is based on autotrophic nitrogen removal. The challenges are classified in terms of operational features and system configuration, namely: (i) the short-term effects of organic carbon source, the COD/N ratio and the temperature on the autotrophic nitrogen removal; the results from this study confirms that the Anammox activity is strongly influenced by temperature, in spite of the COD source and COD/N ratios applied. (ii) The long-term performance of the Anammox process under low nitrogen sludge loading rate (NSLR) and moderate to low temperatures; it demonstrates that NSLR affects nitrogen removal efficiency, granular size and biomass concentration of the bioreactor. (iii) The Anammox cultivation in a closed sponge-bed trickling filter (CSTF) and (iv) the autotrophic nitrogen removal over nitrite in a sponge-bed trickling filter (STF). Both types of Anammox sponge-bed trickling filters offer a plane technology with good nitrogen removal efficiency.
             
        
            
	
	- ISBN:
- 9781138035911
- 9781138035911
- 
			Category:
- Sewage treatment & disposal
- Format:
- Paperback
- Publication Date:
- 
			30-01-2017
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 192
- Dimensions (mm):
- 246x174mm
- Weight:
- 0.36kg
 
        
	            This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
 Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
 Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
 ACT Metro: 2 working days
 NSW Metro: 2 working days
 NSW Rural: 2-3 working days
 NSW Remote: 2-5 working days
 NT Metro: 3-6 working days
 NT Remote: 4-10 working days
 QLD Metro: 2-4 working days
 QLD Rural: 2-5 working days
 QLD Remote: 2-7 working days
 SA Metro: 2-5 working days
 SA Rural: 3-6 working days
 SA Remote: 3-7 working days
 TAS Metro: 3-6 working days
 TAS Rural: 3-6 working days
 VIC Metro: 2-3 working days
 VIC Rural: 2-4 working days
 VIC Remote: 2-5 working days
 WA Metro: 3-6 working days
 WA Rural: 4-8 working days
 WA Remote: 4-12 working days
 
         
Share This Book: