The Master Plan presents a comprehensive 10-year strategy and action plan for improving the subregion's transport linkages across the Bay of Bengal Initiative for Multi-Sectoral Technical and Economic Cooperation (BIMSTEC) member states.
It is intended to guide actions and promote synergies among various connectivity frameworks and help achieve sustainable development of the region. A specific framework is presented here for organizing a set of policies, strategies, and projects toward realizing a shared vision of peace, prosperity, and sustainability. With BIMSTEC's unique geographical position as a bridge linking South and Southeast Asia, this document is also relevant to its neighboring regions. BIMSTEC was established as a regional organization in June 1997 to promote free trade within the region, increase cross-border investment and tourism, and promote technical cooperation.
- ISBN:
- 9789292690694
- 9789292690694
-
Category:
- Transport industries
- Format:
- Paperback
- Publication Date:
-
30-06-2022
- Publisher:
- Asian Development Bank
- Country of origin:
- Philippines
- Pages:
- 162
- Dimensions (mm):
- 279x215x11mm
- Weight:
- 0.33kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: