Free shipping on orders over $99
BIMSTEC Master Plan for Transport Connectivity

BIMSTEC Master Plan for Transport Connectivity

by Asian Development Bank
Paperback
Publication Date: 30/06/2022

Share This Book:

  $71.75
or 4 easy payments of $17.94 with
afterpay
The Master Plan presents a comprehensive 10-year strategy and action plan for improving the subregion's transport linkages across the Bay of Bengal Initiative for Multi-Sectoral Technical and Economic Cooperation (BIMSTEC) member states.

It is intended to guide actions and promote synergies among various connectivity frameworks and help achieve sustainable development of the region. A specific framework is presented here for organizing a set of policies, strategies, and projects toward realizing a shared vision of peace, prosperity, and sustainability. With BIMSTEC's unique geographical position as a bridge linking South and Southeast Asia, this document is also relevant to its neighboring regions. BIMSTEC was established as a regional organization in June 1997 to promote free trade within the region, increase cross-border investment and tourism, and promote technical cooperation.
ISBN:
9789292690694
9789292690694
Category:
Transport industries
Format:
Paperback
Publication Date:
30-06-2022
Publisher:
Asian Development Bank
Country of origin:
Philippines
Pages:
162
Dimensions (mm):
279x215x11mm
Weight:
0.33kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review BIMSTEC Master Plan for Transport Connectivity.