Free shipping on orders over $99
BIMSTEC Master Plan for Transport Connectivity

BIMSTEC Master Plan for Transport Connectivity

by Asian Development Bank
Paperback
Publication Date: 30/06/2022

Share This Book:

RRP  $63.80

RRP means 'Recommended Retail Price' and is the price our supplier recommends to retailers that the product be offered for sale. It does not necessarily mean the product has been offered or sold at the RRP by us or anyone else.

$62.25
or 4 easy payments of $15.56 with
afterpay
The Master Plan presents a comprehensive 10-year strategy and action plan for improving the subregion's transport linkages across the Bay of Bengal Initiative for Multi-Sectoral Technical and Economic Cooperation (BIMSTEC) member states.

It is intended to guide actions and promote synergies among various connectivity frameworks and help achieve sustainable development of the region. A specific framework is presented here for organizing a set of policies, strategies, and projects toward realizing a shared vision of peace, prosperity, and sustainability. With BIMSTEC's unique geographical position as a bridge linking South and Southeast Asia, this document is also relevant to its neighboring regions. BIMSTEC was established as a regional organization in June 1997 to promote free trade within the region, increase cross-border investment and tourism, and promote technical cooperation.
ISBN:
9789292690694
9789292690694
Category:
Transport industries
Format:
Paperback
Publication Date:
30-06-2022
Publisher:
Asian Development Bank
Country of origin:
Philippines
Pages:
162
Dimensions (mm):
280x216x11mm
Weight:
0.33kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review BIMSTEC Master Plan for Transport Connectivity.