The British Rail corporate image and its Rail Blue livery was one of the longest-lived colour schemes carried by the trains of Britain in the forty-eight-year life of the nationalised railway network. Launched in 1965, after Beeching, the then new corporate image was an attempt by the BR design panel to raise the profile of the railway system countrywide and to sweep away the dull steam-era image as the swinging sixties got underway. By the mid-1970s, virtually all BR locomotives and multiple units were carrying Rail Blue livery, while most of the passenger coaches were in matching blue/grey. As the British Rail network was sectorised from the late 1980s in preparation for eventual privatisation, new bold, bright livery schemes for the fleet swept away the familiar, but by then somewhat jaded BR image. The BR blue era is now looked upon with affection as a golden age when the system was operated by an immense variety of locomotives and rolling stock, all now part of history in the same way that the steam era was viewed when the BR blue era ruled on Britain's railways.
- ISBN:
- 9781781558645
- 9781781558645
-
Category:
- Trains & railways: general interest
- Format:
- Paperback
- Publication Date:
-
01-03-2023
- Publisher:
- Fonthill Media Ltd
- Country of origin:
- United Kingdom
- Pages:
- 96
- Dimensions (mm):
- 235x165x8mm
- Weight:
- 0.3kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: