Free shipping on orders over $99
Chloride-Induced Steel Corrosion in Concrete Under Service Loads

Chloride-Induced Steel Corrosion in Concrete Under Service Loads

by Hailong YeChuanqing Fu Ye Tian and others
Hardback
Publication Date: 28/06/2020

Share This Book:

  $210.72
or 4 easy payments of $52.68 with
afterpay
This item qualifies your order for FREE DELIVERY
This book summarizes the latest advances in understanding chloride ingress and steel corrosion in concrete under service loads. Unlike the existing literature, it focuses specifically on the effect of service loads on chloride-induced durability issues in reinforced concrete structures. It discusses how service loads affect the moisture and chloride penetration rate, corrosion kinetics and rust distribution, as well as the structural performance of concrete components (e.g. beams and columns) in a systematic and hierarchical way. Given its scope, the book is chiefly intended for researchers and industry practitioners in structural engineering, particularly those whose work involves the durability design of concrete structures.
ISBN:
9789811541070
9789811541070
Category:
Materials science
Format:
Hardback
Publication Date:
28-06-2020
Publisher:
Springer Verlag, Singapore
Country of origin:
Singapore
Pages:
138
Dimensions (mm):
235x155mm
Weight:
0.45kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Chloride-Induced Steel Corrosion in Concrete Under Service Loads.