Free shipping on orders over $99
Coordination and Optimization of Grid-Tied Power Converters

Coordination and Optimization of Grid-Tied Power Converters

From Pulse Width Modulation Perspective

by Feng Gao and Tao Xu
Hardback
Publication Date: 03/12/2021

Share This Book:

  $285.54
or 4 easy payments of $71.38 with
afterpay
This item qualifies your order for FREE DELIVERY
This book investigates the control and optimization of grid-tied power converters, with a special attention attached to pulse width modulation, which determines the size and cost of power converters as well as switching harmonics. Through the methods introduced in this book, multiple grid-tied power converters safely operate and coordinate in a highly efficient and reliable fashion, thereby boosting the operation of modern power grids. To facilitate understanding, the key methods are presented together with their associated algorithms and detailed software codes. In parallel to theoretical treatments, this book further applies the methods into practical scenarios and industrial products, thus enhancing their credibility. The book serves as a guidance for electrical engineers and researchers in the field of power electronics and power systems.
ISBN:
9789811674457
9789811674457
Category:
Electrical engineering
Format:
Hardback
Publication Date:
03-12-2021
Publisher:
Springer Verlag, Singapore
Country of origin:
Singapore
Pages:
214
Dimensions (mm):
235x155mm
Weight:
0.52kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Coordination and Optimization of Grid-Tied Power Converters.