Mathias Baldwin built his first steam locomotivein 1832, with the assistance of a railroad mechanic named Andrew Vauclain. Five decades later, his son Samuel M. Vauclain joined the Baldwin Locomotive Works Company. Vauclain developed the compound locomotive in 1889, an achievement that changed the face of the railroad industry. He also engineered many engine prototypes, and performed developmental work on the balanced compound. A lifetime employee at Baldwin, he served as General Superintendent, Vice-President, President, and finally as Chairman of the Board, until his death in 1940. This catalog, which dates from 1900, shows Baldwin's full line of compound locomotive products and includes a discussion of their method of operation and maintenance. Itincludes technical specifications and other data. This version of the book has been slightly enlarged and reformatted for readability, but care has been taken to preserve the integrity of the original text.
- ISBN:
- 9781935700159
- 9781935700159
-
Category:
- Trains & railways: general interest
- Format:
- Paperback
- Publication Date:
-
06-04-2010
- Publisher:
- Periscope Film LLC
- Country of origin:
- United States
- Pages:
- 98
- Dimensions (mm):
- 254x203x5mm
- Weight:
- 0.21kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: