Free shipping on orders over $99
Design and Simulation of Heavy Haul Locomotives and Trains

Design and Simulation of Heavy Haul Locomotives and Trains

by Tim McSweeneyPeter Wolfs Colin Cole and others
Hardback
Publication Date: 21/09/2016

Share This Book:

29%
OFF
RRP  $273.00

RRP means 'Recommended Retail Price' and is the price our supplier recommends to retailers that the product be offered for sale. It does not necessarily mean the product has been offered or sold at the RRP by us or anyone else.

$195.25
or 4 easy payments of $48.81 with
afterpay
This item qualifies your order for FREE DELIVERY

With the increasing demands for safer freight trains operating with higher speed and higher loads, it is necessary to implement methods for controlling longer, heavier trains. This requires a full understanding of the factors that affect their dynamic performance. Simulation techniques allow proposed innovations to be optimised before introducing them into the operational railway environment. Coverage is given to the various types of locomotives used with heavy haul freight trains, along with the various possible configurations of those trains. This book serves as an introductory text for college students, and as a reference for engineers practicing in heavy haul rail network design,

ISBN:
9781498733526
9781498733526
Category:
Mechanical engineering
Format:
Hardback
Publication Date:
21-09-2016
Language:
English
Publisher:
CRC Press LLC
Country of origin:
United States
Dimensions (mm):
240x162x31mm
Weight:
0.79kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Design and Simulation of Heavy Haul Locomotives and Trains.