Free shipping on orders over $99
Design Manual for Pitched Slope Protection

Design Manual for Pitched Slope Protection

CUR-Reports 155

by The Netherlands CUR-Gouda
Hardback
Publication Date: 01/01/1995

Share This Book:

  $958.90
or 4 easy payments of $239.72 with
afterpay
This item qualifies your order for FREE DELIVERY
This manual describes current methods for designing dike revetments of pitched blocks & block mattresses. The use of such revetments on river & canal banks is also considered briefly. Guidelines are discussed for preparing designs for new revetments; Methods are also given for checking existing revetments. The manual is aimed at the practical application of the result of basic research into block pitching. Pitched dike revetments include following revetments systems: Basalt & other natural rock; Concrete blocks & column & other small cement concrete elements; & Block mattresses.
ISBN:
9789054106067
9789054106067
Category:
Sanitary & municipal engineering
Format:
Hardback
Publication Date:
01-01-1995
Language:
English
Publisher:
A A Balkema Publishers
Country of origin:
Netherlands
Pages:
298
Dimensions (mm):
234x156x20.32mm
Weight:
0.77kg

This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Design Manual for Pitched Slope Protection.