Free shipping on orders over $99
Design of Fuel Handling and Storage Systems for Nuclear Power Plants

Design of Fuel Handling and Storage Systems for Nuclear Power Plants

IAEA Safety Standards Series No. SSG-63

by International Atomic Energy Agency
Paperback
Publication Date: 30/04/2021

Share This Book:

  $82.90
or 4 easy payments of $20.72 with
afterpay

This Safety Guide provides recommendations on how to meet the requirements of IAEA Safety Standards Series No. SSR-2/1 (Rev. 1), Safety of Nuclear Power Plants: Design, in relation to fuel handling and storage systems. The publication addresses the design aspects of handling and storage systems for fuel that remain part of the operational activities of a nuclear reactor. It covers the following stages of fuel handling and storage in a nuclear power plant: receipt, storage and inspection of fresh fuel before use and transfer of fresh fuel into the reactor; removal of irradiated fuel from the reactor and transfer of the irradiated fuel to the spent fuel pool; and reinsertion of irradiated fuel from the spent fuel pool into the reactor. Recommendations are also provided on the storage, inspection and repair of irradiated or spent fuel in the spent fuel pool, and the preparation for the removal of this fuel from the spent fuel pool and on the handling of fuel casks in the spent fuel pool and on their transfer.

ISBN:
9789201085191
9789201085191
Category:
Energy technology & engineering
Format:
Paperback
Publication Date:
30-04-2021
Language:
English
Publisher:
International Atomic Energy Agency
Country of origin:
Austria
Dimensions (mm):
233.17x134.37x4.83mm
Weight:
0.13kg

This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Design of Fuel Handling and Storage Systems for Nuclear Power Plants.