Seawater desalination is a coastal-based industry. The growing number of desalination plants worldwide and the increasing size of single facilities emphasises the need for greener desalination technologies and more sustainable desalination projects. Two complementing approaches are the development and implementation of best available technology (BAT) standards and best practice guidelines for environmental impact assessment (EIA) studies. While BAT is a technology-based approach, which favours state of the art technologies that reduce resource consumption and waste emissions, EIA aims at minimizing impacts at a site- and project-specific level through environmental monitoring, evaluation of impacts, and mitigation where necessary. This book contains a comprehensive evaluation and synthesis of the potential environmental impacts of desalination plants, with emphasis on the marine environment and aspects of energy use, followed by the development of strategies for impact mitigating. A concept for BAT for seawater desalination technologies is proposed, in combination with a methodological approach for the EIA of desalination projects. The scope of the EIA studies are outlined, including environmental monitoring, toxicity and hydrodynamic modelling studies, and the usefulness of multi-criteria analysis as a decision support tool for EIAs is explored and used to compare different intake and pre-treatment options for seawater reverse osmosis plants.
- ISBN:
- 9781138474635
- 9781138474635
-
Category:
- Water purification & desalinization
- Format:
- Hardback
- Publication Date:
-
02-10-2017
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 290
- Dimensions (mm):
- 246x174mm
- Weight:
- 0.7kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: