Free shipping on orders over $99
Developments in International Bridge Engineering

Developments in International Bridge Engineering

Selected Papers from Istanbul Bridge Conference 2018

by Polat GülkanAlp Caner and Nurdan Memisoglu Apaydin
Hardback
Publication Date: 28/04/2021

Share This Book:

  $317.33
or 4 easy payments of $79.33 with
afterpay
This item qualifies your order for FREE DELIVERY
Numerical investigations on the collapse of the Morandi Bridge.- Importance of "Heuristics" in Suspension Bridge Engineering and 1915 Çanakkale Bridge.- Bridge Failures and Mitigation using Monitoring Technologies.- 1915 Çanakkale Bridge - Meeting the Challenge.- "Piccoli Angeli" Bridge Over Gorzone Canal In Cavarzere (VE).- Predicting Time-Dependent Deformations of Prestressed Concrete Girders.- Bridge Engineering Optimization Opportunities Through Integrated Solutions: Design - Constructive Method.- Load Distribution And In-Plane Superstructure Movements On Highly Skewed Steel Girder Bridges.- Soil-Structure Interaction Analysis Of A Railway Bridge In Rotterdam.- Reliability Based Safety Level Evaluation Of Cable Members Of Cable-Stayed Bridges In Turkey.- Design of Izmir Bay Crossing Bridge.
ISBN:
9783030591687
9783030591687
Category:
Conservation of buildings & building materials
Format:
Hardback
Publication Date:
28-04-2021
Language:
English
Publisher:
Springer International Publishing AG
Country of origin:
Switzerland
Dimensions (mm):
235x155mm
Weight:
0.58kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Developments in International Bridge Engineering.