Free shipping on orders over $99
Energy-aware Scheduling on Multiprocessor Platforms

Energy-aware Scheduling on Multiprocessor Platforms

by Dawei Li and Jie Wu
Paperback
Publication Date: 20/10/2012

Share This Book:

  $101.07
or 4 easy payments of $25.27 with
afterpay
This item qualifies your order for FREE DELIVERY
Multiprocessor platforms play important roles in modern computing systems, and appear in various applications, ranging from energy-limited hand-held devices to large data centers. As the performance requirements increase, energy-consumption in these systems also increases significantly. Dynamic Voltage and Frequency Scaling (DVFS), which allows processors to dynamically adjust the supply voltage and the clock frequency to operate on different power/energy levels, is considered an effective way to achieve the goal of energy-saving. This book surveys existing works that have been on energy-aware task scheduling on DVFS multiprocessor platforms.

Energy-aware scheduling problems are intrinsically optimization problems, the formulations of which greatly depend on the platform and task models under consideration. Thus, Energy-aware Scheduling on Multiprocessor Platforms covers current research on this topic and classifies existing works according to two key standards, namely, homogeneity/heterogeneity of multi processor platforms and the task types considered. Under this classification, other sub-issues are also included, such as, slack reclamation, fixed/dynamic priority sched uling, partition-based/global scheduling, and application-specific power consumption, etc.
ISBN:
9781461452232
9781461452232
Category:
Electrical engineering
Format:
Paperback
Publication Date:
20-10-2012
Language:
English
Publisher:
Springer-Verlag New York Inc.
Country of origin:
United States
Pages:
59
Dimensions (mm):
235x155x3mm
Weight:
1.18kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Energy-aware Scheduling on Multiprocessor Platforms.