This book covers a range of topics that are of increasing importance in engineering practice: natural hazards, pollution, and environmental protection through good practice.
The first half of the book deals with natural risk factors, of both natural and human origin, that should be considered: subsidence, accidental infiltration, soil instability, rockslides and mudslides, debris flow, and degradation of buildings and monuments due to pollution and climactic effects, for example. These problems are highlighted and it is shown that a combination of sophisticated numerical techniques and extensive experimental investigations are necessary in order to effectively tackle these problems.
The second half of the book is devoted to the use of polluted sites and associated problems, a topic of growing significance given the increasing reclamation of land from abandoned industrial sites for urban development over the last 20 years. Different types of oil pollution and decontamination methods are described, followed by a discussion of waste management and detailed coverage of confinement liners used in surface waste disposal.
- ISBN:
- 9781848211667
- 9781848211667
-
Category:
- Structural engineering
- Format:
- Hardback
- Publication Date:
-
16-07-2010
- Language:
- English
- Publisher:
- ISTE Ltd and John Wiley & Sons Inc
- Country of origin:
- United Kingdom
- Pages:
- 544
- Dimensions (mm):
- 241x163x36mm
- Weight:
- 0.92kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: