Flooding claims many lives worldwide each year. In addition, many more lives are affected by homelessness, disease and crop failures as a result of floods' destructiveness. The number of recent flood events coupled with climate change predictions and urban development, suggest that these statistics are likely to worsen in the future. Flooding in populated areas can cause substantial property damage as well as threaten human life. Apart from the obvious physical damage to buildings, contents and loss of life, there other more indirect losses that are often overlooked. These intangible impacts are generally associated with disruption to normal life as well as longer term health issues, including stress-related illness. The conference papers cover the following topics: Flood Risk Management; Flood Risk Vulnerability; Emergency Preparedness and Response; Flood Forecasting; Flood Case Studies; Responses to Reduce Vulnerability to Flooding.
- ISBN:
- 9781845645885
- 9781845645885
-
Category:
- Flood control
- Format:
- Hardback
- Publication Date:
-
30-05-2012
- Language:
- English
- Publisher:
- WIT Press
- Country of origin:
- United Kingdom
- Pages:
- 350
- Dimensions (mm):
- 230x155mm
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: