6 1/2 X 9 7/16 in An overview of physical adsorption methods for the characterization of f inely divided and porous materials and their application to fluid cracki ng catalysts (FCCs) (J.P. Olivier).
The determination of acidity in fluid cracking catalysts (FCCs) from adsorpt ion microcalorimetry of probe molecules (J. Shen, A. Auroux).
The use of atomic force microscopy (AFM) to stu dy the surface topography of commercial fluid cracking catalysts (FCCs) and pillared interlayered clay (PILC) catalysts (M.L. Occelli, S.A.C. Go uld).
New developments of NMR Spectroscop y applied to zeolites (H. Koller).
New c atalysts may provide insights into role of nonframework alumina in catal ytic cracking catalysis
(R.W. Fowler, R. Hu).
Mechanism of fluid cracking catalysts deactivation by Fe (G. Yaluris et al.).
Simula ting iron-induced FCC accessibility losses in lab-scale deactivation (D. R. Rainer et al.).
Reduction of
- ISBN:
- 9780444514738
- 9780444514738
-
Category:
- Petroleum technology
- Format:
- Hardback
- Publication Date:
-
06-07-2004
- Language:
- English
- Publisher:
- Elsevier Science & Technology
- Country of origin:
- United Kingdom
- Pages:
- 390
- Dimensions (mm):
- 240x165x20mm
- Weight:
- 0.85kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: