The Technology Program GAST was executed from 1981 to 1987 as a German-Spanish joint program aiming at the development and the investigation of necessary solar specific components and software for a gas-cooled tower power station of medium size. After the tests had been successfully completed at the Plata forma Solar de Almeria in 1987, the proceedings are now presented to inform the experts and the public about these developments and their results. Not intending to anticipate a detailed valuation of the results, however, we as the project monitors of the Technology program resume that the intended aims are nearly entirely achieved and that principally the way for the construction and operation of a gas cooled solar tower power plant has been prepared. Essential for this successful completion were not only a promising concept, a careful design, a precise plan ning, solid fabrication and installation as well as careful tests, but also the extraordinarily good cooperation between the engaged companies, institutes, organisations and advisory groups.
- ISBN:
- 9783540501213
- 9783540501213
-
Category:
- Engineering: general
- Format:
- Paperback
- Publication Date:
-
07-12-1988
- Language:
- English
- Publisher:
- Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
- Country of origin:
- Germany
- Pages:
- 379
- Dimensions (mm):
- 229x152x20mm
- Weight:
- 0.59kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: