Without any protective intervention, the historic city of Venice and its surrounding islands would suffer rapid deterioration due to the increased frequency of tidal flooding, as the gap between land surface and sea levels has reduced due to a coupled effect of climate change-induced sea level rise and natural and anthropic subsidence.
Geotechnics of Venice and Its Lagoon provides a clear and comprehensive illustration of the extensive geotechnical aspects of not only the various environmental problems such as land subsidence and wetland surface reduction, but also solutions such as the design of the tilting gate foundations against high tides and the restoration and improvement of the drainage system of the renowned Piazza San Marco, which have been necessary for the preservation of the extraordinary cultural heritage of Venice. Readers will gain a better understanding of the complex phenomena occurring in the sensitive Venice silts, whose hydro-mechanical behaviour has required comprehensive laboratory and site investigations and modeling.
An authoritative analysis of one of the largest and most important geotechnical issues in the world
Description of a detailed case study of an ongoing engineering solution
The book is useful for engineers worldwide, and is also an excellent reference for students.
- ISBN:
- 9781032049564
- 9781032049564
-
Category:
- Soil & rock mechanics
- Format:
- Hardback
- Publication Date:
-
03-08-2023
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 158
- Dimensions (mm):
- 234x156mm
- Weight:
- 0.42kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: