The emergent so-called "Fourth Industrial Revolution" is regarded by some as a panacea for bringing about development to Africans. This book dismisses this flawed reasoning. Surfacing how "investors" are actually looting and plundering Africa; how the industrial internet of things, the gig economies, digital economies and cryptocurrencies breach African political and economic sovereignty, the book pioneers what can be called anticipatory economics - which anticipate the future of economies. It is argued that the future of Africans does not necessarily require degrowth, postgrowth, postdevelopment, postcapitalism or sharing/solidarity economies: it requires attention to age-old questions about African ownership and control of their resources. Investors have to invest in ensuring that Africans own and control their resources. Further, it is pointed out that the historical imperial structural creation of forced labour is increasingly morphing into what we call the structural creation of forced leisure which is no less lethal for Africans. Because both the structural creation of forced labour and the structural creation of forced leisure are undergirded by transnational neo-imperial plunder, theft, robbery, looting and dispossession of Africans, this book goes beyond the simplistic arguments that Euro-America developed due to the industrial revolutions.
- ISBN:
- 9789956550302
- 9789956550302
-
Category:
- Political structure & processes
- Format:
- Paperback
- Publication Date:
-
04-02-2019
- Publisher:
- Langaa RPCID
- Pages:
- 654
- Dimensions (mm):
- 244x170x33mm
- Weight:
- 1.02kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: