The busy London Underground may seem an unlikely location for heritage train operation, especially that involving steam. However, this was the world's first Underground railway network, and the original sections were built to main line gauge using steam traction. London Transport and its successor London Underground Ltd have been acutely aware of the significance of this and have strived to preserve and present their heritage. Over the decades, open days and special trains operated over parts of the system. This included the running of steam-, diesel- and electric-hauled trains for the public to ride on, while at the same time maintaining the normal level of Underground train service on these lines. These special trains ran not only in the open-air outer sections of the network, but even on occasion through the cut-and-cover tunnel sections of central London.New signalling systems mean that this is unlikely to happen again, but the London Transport Museum continues to offer a programme of exhibitions, guided history tours and open days at the Acton museum depot.This book looks back at the principal events between 1963 and 2019.
- ISBN:
- 9781398115293
- 9781398115293
-
Category:
- Trains & railways: general interest
- Format:
- Paperback
- Publication Date:
-
15-08-2023
- Language:
- English
- Publisher:
- Amberley Publishing
- Country of origin:
- United Kingdom
- Dimensions (mm):
- 233.93x165.1x7.62mm
- Weight:
- 0.3kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: