We live in a world which continues to experience dramatic suffering and loss of life due to natural hazard. The disaster paradigm has accelerated efforts towards resilience building, particularly since the adoption of the Hyogo Framework for Action (HFA), a ten year plan to build the resilience of nations and communities to disasters Urban areas present complexity and interconnectivity of various elements, and this needs to be considered when building the resilience of such areas to disasters. To address urban risks, local level disaster risk reduction (DRR) is of fundamental importance, not only because it is closer to the citizens, but because it is the repository of regulatory governance functions and local knowledge The need to scale up the capacity of DRR at the local government level to build urban resilience is a key incentive for this study. With particular reference to the example of Makati City in the Philippines, this book analyses a local DRR approach with reference to the HFA, applies a micro-level resilience assessment and discusses an effective model for enhancing local DRR capacity in the future.
- ISBN:
- 9781783509270
- 9781783509270
-
Category:
- Natural disasters
- Format:
- Hardback
- Publication Date:
-
04-09-2014
- Publisher:
- Emerald Publishing Limited
- Country of origin:
- United Kingdom
- Pages:
- 328
- Dimensions (mm):
- 229x152x21mm
- Weight:
- 0.63kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: