Free shipping on orders over $99
Impact Analysis of Power Quality Problems of Transformers

Impact Analysis of Power Quality Problems of Transformers

by Jaspreet Singh
Paperback
Publication Date: 12/10/2022

Share This Book:

25%
OFF
RRP  $79.19

RRP means 'Recommended Retail Price' and is the price our supplier recommends to retailers that the product be offered for sale. It does not necessarily mean the product has been offered or sold at the RRP by us or anyone else.

$59.75
or 4 easy payments of $14.94 with
afterpay
INTRODUCTION

1.1 GENERAL

The electrical power distribution system is designed to supply electric energy as

economically as possible, with an acceptable degree of reliability and quality. In a power

distribution system, the distribution transformer is the most important apparatus. The role of

the transformer begins at generating station as the power is generated at the maximum value of

11 VK at generating stations in India and is far away from the load centers. This power

needs stepping up to extra high voltages for reduction of current and subsequent losses

during transmission.
ISBN:
9789620364518
9789620364518
Category:
Commodities
Format:
Paperback
Publication Date:
12-10-2022
Publisher:
Infotech Publishers
Pages:
226
Dimensions (mm):
229x152x12mm
Weight:
0.31kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Impact Analysis of Power Quality Problems of Transformers.