On a global scale, sewage represents the main point-source of water pollution and is also the predominant source of nitrogen contamination in urban regions. The present research is focused on the study of the main challenges that need to be addressed in order to achieve a successful inorganic nitrogen post-treatment of anaerobic effluents in the mainstream. The post-treatment is based on autotrophic nitrogen removal. The challenges are classified in terms of operational features and system configuration, namely: (i) the short-term effects of organic carbon source, the COD/N ratio and the temperature on the autotrophic nitrogen removal; the results from this study confirms that the Anammox activity is strongly influenced by temperature, in spite of the COD source and COD/N ratios applied. (ii) The long-term performance of the Anammox process under low nitrogen sludge loading rate (NSLR) and moderate to low temperatures; it demonstrates that NSLR affects nitrogen removal efficiency, granular size and biomass concentration of the bioreactor. (iii) The Anammox cultivation in a closed sponge-bed trickling filter (CSTF) and (iv) the autotrophic nitrogen removal over nitrite in a sponge-bed trickling filter (STF). Both types of Anammox sponge-bed trickling filters offer a plane technology with good nitrogen removal efficiency.
- ISBN:
- 9781138474420
- 9781138474420
-
Category:
- Flood control
- Format:
- Hardback
- Publication Date:
-
09-10-2017
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 240
- Dimensions (mm):
- 240x170mm
- Weight:
- 0.45kg
Our Australian supplier has this title on order. You can place a backorder for this title now and we will ship it to you when it becomes available.
While we are unable to provide a delivery estimate, most backorders will be delivered within 120 days. If we are informed by our supplier that the title is no longer available during this time, we will cancel and refund you for this item. Likewise, if no delivery estimate has been provided within 120 days, we will contact our supplier for an update. If there is still no delivery estimate we will then cancel the item and provided you with a refund.
If we are able to secure you a copy of the title, our supplier will despatch it to our Sydney warehouse. Once received we make sure it is in perfect condition and then despatch it to you via the Australia Post eParcel service, which includes online tracking. You will receive a shipping notice from us when this occurs.
Share This Book: