With the rapid development of Chinese urbanization in the 21st century, "urban diseases" become more serious, mainly manifested in water environmental pollution, urban flooding, water shortage, and deterioration of water ecology. It is necessary to establish a modern rainwater management system, scientifically solve the problem of excess urban rainwater and to improve water environment quality. Improvement of water environment quality is conducive to the ecological function of a sponge city. Sponge city construction has contributed to control non-point source pollution. Sponge systems cause the stagnation and purification of rainwater runoff, which is an important guarantee for water environment quality. This monograph summarizes theories and practices of the integrated water environment treatment in Chongqing, a typical representative mountainous city in the Three Gorges Reservoir Region. Based on the mountainous terrain and unique water environment characteristics in the Three Gorges Reservoir Region, the monograph analyzes measures and difficulties in the basin water environment integrated treatment. Moreover, the monograph makes suggestions for risk management amid drainage systems during the COVID-19 epidemic.
- ISBN:
- 9780367674106
- 9780367674106
-
Category:
- Hydrology & the hydrosphere
- Format:
- Paperback
- Publication Date:
-
01-08-2022
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 244
- Dimensions (mm):
- 246x174mm
- Weight:
- 0.45kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: