Intelligent Transport Systems (ITS) are expected to add considerable productivity to existing transportation infrastructure and to therefore partially reduce the need for more physical infrastructure such as additional lanes of roadway. But there are huge barriers to achieving this vision ranging from the technical to the institutional. In this work a new outcome-orientated methodology is developed and applied to a diverse set of ITS case studies in an effort to gain insight into the barriers to deployment. The case studies, mostly from the National Capital Region (Washington) in the USA, include but are not limited to evaluation of electronic tolling, truck roll over warning systems, Advanced Traffic Information Systems (ATIS), variable message signs (VMS), ITS enhanced emergency management systems and ITS bridge operations. The evaluation methodology bears similarity to the benefit/cost balance sheet approach. Full cost (benefit) assessment is adopted with multiple externalities (environment, economic development, social equity issues and so on) formally included in each of the individual evaluations.
- ISBN:
- 9781840644470
- 9781840644470
-
Category:
- Intelligent & automated transport system technology
- Format:
- Hardback
- Publication Date:
-
25-04-2001
- Publisher:
- Edward Elgar Publishing Ltd
- Country of origin:
- United Kingdom
- Pages:
- 240
- Dimensions (mm):
- 234x156mm
- Weight:
- 0.45kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: