Free shipping on orders over $99
Interconnected Power Systems

Interconnected Power Systems

Wide-Area Dynamic Monitoring and Control Applications

by Yijia CaoDechang Yang Fang Liu and others
Hardback
Publication Date: 10/02/2016

Share This Book:

  $84.99
or 4 easy payments of $21.25 with
afterpay
This book reports on the latest findings in the application of
the wide area measurement systems (WAMS) in the analysis and control of power
systems. The book collects new research ideas and achievements including a
delay-dependent robust design method, a wide area robust coordination strategy,
a hybrid assessment and choice method for wide area signals, a free-weighting
matrices method and its application, as well as the online identification
methods for low-frequency oscillations. The main original research results of
this book are a comprehensive summary of the authors' latest six-year study.
The book will be of interest to academic researchers, R&D engineers and
graduate students in power systems who wish to learn the core principles,
methods, algorithms, and applications of the WAMS.
ISBN:
9783662486252
9783662486252
Category:
Power networks
Format:
Hardback
Publication Date:
10-02-2016
Publisher:
Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
Country of origin:
Germany
Pages:
223
Dimensions (mm):
235x155x14mm
Weight:
4.85kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Interconnected Power Systems.