The auxiliary do (tun) is one of the most-discussed constructions in West Germanic. In German, there is a striking opposition between modern standard German, where the construction is virtually ungrammatical and considered to be "sub-standard" by most speakers, whilst, as this book shows, the construction is attested in all modern dialects as well as historic stages since 1350. In answering why auxiliary tun is ungrammatical in modern standard German, it is shown that the stigmatization of tun was caused by prescriptive grammarians in the 16th-18th century. Furthermore it is shown that the stigmatization of tun as "bad" German occurred in clearly discernible stages, from bad poetry (1550-1680), to bad written German (1680-1740) and finally to "bad" German in general (after 1740), thus providing evidence that the history of the standardization of German needs to take into account direct metalinguistic comments from prescriptive grammarians. The effectiveness of linguistic purism is also shown by evidence from two other constructions, namely polynegation and double perfect.
- ISBN:
- 9783110170245
- 9783110170245
-
Category:
- linguistics
- Format:
- Hardback
- Publication Date:
-
23-08-2001
- Language:
- English
- Publisher:
- De Gruyter
- Country of origin:
- Germany
- Pages:
- 322
- Dimensions (mm):
- 230x155x19mm
- Weight:
- 0.6kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: