Introduction. Initiative on long term durability of mat erials and structures (J. Larsen-Basse, K.P. Chong).
Structures.
Approaches to enhancing concrete bridge deck durability (V.C. Hi, J. Zhang).
Long-term reliability o f structural systems (S. Mahadevan et al.).
Developm ent of an intelligent structural damage assessment system: preliminary r esults (R.M.V. Pidaparti, M.J. Palakal)
Accelerated testing a nd modeling of concrete durability subjected to coupled environmental an d mechanical loading (Y. Xi et al.).
Interface dura bility of construction materials externally reinforced with FRP composit es (J.F. Davalos, P. Z. Qiao).
Corrosion.
Experimental and theoretical study of reinforced co ncrete corrosion using impedance measurements (J. Zhang et al.) .
Corrosion and embrittlement of high-strength bridge wires(G. Vermaas et al.).
Accelerated testing f or concrete reinforcing bar corrosion protection systems (D. Darwin
- ISBN:
- 9780080438900
- 9780080438900
-
Category:
- Materials science
- Format:
- Hardback
- Publication Date:
-
29-08-2001
- Language:
- English
- Publisher:
- Elsevier Science & Technology
- Country of origin:
- United Kingdom
- Pages:
- 312
- Dimensions (mm):
- 260x195x19mm
- Weight:
- 0.68kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: