This manual of best practices provides complete information for designing, installing, and maintaining steel pipe and fittings for potable water transmission and distribution.
M11 has been completely updated with new and revised information has been incorporated into every chapter within the fifth edition. Additional information on, fittings design, welded joint design, suggested bracing for shipping of pipe, weld details for outlets and crotch plates, aboveground design and more has been added. Updates have been made to materials, external load consideration, buckling analysis, pipe joints, coatings and corrosion prevention. Additionally, a new chapter on thrust design has been added, as well as four new appendices.
M11 includes access to an interactive tool for torque calculations
Need it now? Learn about AWWA's digital downloads.
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: