The first part of this third volume focuses on the design of mechatronic components, in particular the feed drives of machine tools used to generate highly dynamic drive movements. Engineering guides for the selection and design of important machine components, the control technology of feed drives, and the measuring systems required for position capture are presented. Another focus is on process and diagnostic equipment for manufacturing machines and systems. The second part describes control concepts including programming methods for various applications of modern production systems. Programmable logic controllers (PLC), numerical controllers (NC) and robot controllers (RC) are part of these presentations. In the context of automated manufacturing systems, the various levels of the automation pyramid and the importance of control systems are also outlined. Finally, the volume deals with the engineering of machines and plants.
The German Machine Tools and Production Systems Compendium has been completely revised. The previous five-volume series has been condensed into three volumes in the new ninth edition with colored technical illustrations throughout. This first English edition is a translation of the German ninth edition.
- ISBN:
- 9783658346249
- 9783658346249
-
Category:
- Production engineering
- Format:
- Paperback
- Publication Date:
-
15-12-2022
- Publisher:
- Springer
- Country of origin:
- Netherlands
- Pages:
- 697
- Dimensions (mm):
- 279x210mm
- Weight:
- 1.75kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: