CONTENTS Introduction General --- Joint Service Responsibility --- Maintenance Standards, Policies, and Criteria --- Terminology --- Planning --- Preparation for Work --- Access to Work --- Safety Timber Structures Preservation of Wood --- Inspection --- Maintenance Concrete Structures Concrete Technology --- Causes and Types of Deterioration --- Methods of Inspection --- Repair Methods Stone Masonry Structures Introduction --- Method of Inspection --- Methods of Repair Rubble-Mound Structures Structural Components --- Causes and Types of Deterioration --- Inspection --- Methods of Repair Structures Involving Soil Soil Description --- Soil Placement --- Inspection --- Repair Steel Structures Corrosion --- Protective Coatings --- Cathodic Protection --- Substitute Materials for Steel --- Inspection --- Maintenance of Steel Structures Plastic and Elastomeric Structures Types of Materials --- Construction Techniques References Glossary Appendices Diver Inspection of Structures --- Inspection, Documentation, Maintenance, and Certification of Graving Docks Index
- ISBN:
- 9781410219756
- 9781410219756
-
Category:
- Technology: general issues
- Format:
- Paperback
- Publication Date:
-
26-01-2005
- Publisher:
- University Press of the Pacific
- Country of origin:
- United States
- Pages:
- 148
- Dimensions (mm):
- 279x210x8mm
- Weight:
- 0.35kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: