This book proposes a methodology for the identification of flooding in urban areas, by the denomination of 1) urban hydrographic basin; and 2) polygon of flood risk. This work will enable readers to elaborate a preventive program in Latin America and analogous regions. The authorities could use it as a basis to create urban planning strategies or preventive programs to reduce or eliminate the flooding hazard. The growth of an urban area implies that the natural terrain is covered by an asphalt folder, which results in an Urban Hydrographic Basin where rainwater drains down its streets filtering through sewers towards rainwater drains or wastewater. Initially, the drainages are calculated according to the population in a specific urban area, however, the population growth causes the growth of the urban area, where the old drainages and new roads are linked, causing their saturation and chaos. More water runs down the streets and is accumulated in the lower areas, causing flooding.
- ISBN:
- 9783030224714
- 9783030224714
-
Category:
- Natural disasters
- Format:
- Paperback
- Publication Date:
-
27-11-2019
- Publisher:
- Springer Nature Switzerland AG
- Country of origin:
- Switzerland
- Pages:
- 58
- Dimensions (mm):
- 235x155mm
- Weight:
- 0.45kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: