In Western culture, from an early age we are ingrained with the notion that weight in building construction equals strength as evinced even in children's stories such as the 'The Three Little Pigs'. This idea of the relative strength of mass pervades our culture as a fundamental truth, but heavy materials are not intrinsically stronger than lighter ones. While time will be needed to remove the biases that we carry in our cultural DNA, our perception of strength has begun to shift. If we look at the historical evolution of architecture - from the massive pyramids of Egypt to the framed structures of Greek and Roman construction, to the lighter Gothic vaulting and eventually modern architecture of the twentieth century - we see a continuous, almost linear progression from solid mass construction to diaphanous skins of glass and steel. This is our historic journey from mass to membrane. AUTHOR: Nicholas Goldsmith, FAIA, is the founder and principal of FTL Design Engineering Studio in New York and a fellow of the AIA and former chair of the Lightweight Structures Association. Prior, he was a designer for the Pritzker Prize Winner Frei Otto in Germany. Nic has designed exhibitions including exhibitions on solar energy for the Cooper-Hewitt, National Design Museum, and is featured in innumerable publications including FTL: Softness, Movement, Light (Academy Press, 1997). 200 colour images
- ISBN:
- 9781940743899
- 9781940743899
-
Category:
- History of architecture
- Format:
- Hardback
- Publication Date:
-
01-11-2018
- Publisher:
- Oro Editions
- Country of origin:
- United States
- Pages:
- 208
- Dimensions (mm):
- 279x229x0mm
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: