Free shipping on orders over $99
NASA Project Gemini Familiarization Manual Manned Satellite Spacecraft

NASA Project Gemini Familiarization Manual Manned Satellite Spacecraft

by NASA
Paperback
Publication Date: 26/05/2011

Share This Book:

26%
OFF
RRP  $88.00

RRP means 'Recommended Retail Price' and is the price our supplier recommends to retailers that the product be offered for sale. It does not necessarily mean the product has been offered or sold at the RRP by us or anyone else.

$65.25
or 4 easy payments of $16.31 with
afterpay
Just ten days after Alan Shepard Jr. became America's first man in space on May 5, 1961, President John F. Kennedy challenged the nation, suggesting that the United States should land a man on the moon by the end of the decade. The ambitious goal of Project Apollo required a series of intermediate steps, which were to be explored by Project Gemini. Created on January 3, 1962, Project Gemini's objectives were many. During ten manned flights in 1965 and 1966, astronauts would perform spacewalks, rendezvous with orbiting vehicles using maneuvering and propulsion systems, and perform docking tests. A great deal of experience was gained and equipment tested, and with one exception - a dry land capsule landing - all of the planned objectives were met. All ten manned flights were made using Titan II two-stage boosters that were purpose-built for Gemini and known as "GLV" or Gemini-Titans. The prime contractor for the Mercury capsule McDonnell Aircraft, constructed the two-man Gemini capsule. A larger, more sophisticated spacecraft than Mercury, the Gemini capsule relied on a detachable Equipment Module for power, propulsion, and life-support systems. The capsule itself was outfitted with ejection seats, carried an on-board Guidance Computer, and could be flown in six directions. Created by NASA and contractor McDonnell Aircraft, this Familiarization Manual explains all the systems aboard the Mercury space capsule including cabin controls, sequence, electrical power, cooling, guidance and control, communications, retrograde rocket, and landing systems and procedures. Dating from September of 1965 for the long range and extended missions, it represents a late revision of documents created at the beginning of the Gemini program. Originally restricted, this manual has been declassified and is presented in its entirety, running nearly 600 pages.
ISBN:
9781935700692
9781935700692
Category:
Aircraft: general interest
Format:
Paperback
Publication Date:
26-05-2011
Publisher:
Periscope Film LLC
Country of origin:
United States
Pages:
584
Dimensions (mm):
254x203x30mm
Weight:
1.14kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review NASA Project Gemini Familiarization Manual Manned Satellite Spacecraft.