Tolerance Analysis of Mechanical Assemblies using Monte Carlo Simulation - A Case Study.- Operationalization & measurement of service quality in manufacturing supply chains: a conceptual framework.- A novel framework for evaluation of failure risk in thermal power industry.- Modeling and analysis of critical success factors for implementing the it based supply chain performance system.- Lean-sigma for product improvement using the voc for enhancing the product competitiveness.- Structural Equation Modeling application to assess environmental aspects in implementing Sustainable Manufacturing.- Service quality through the lens of sap-lap methodology: a case study.- Selection of the optimum hole quality conditions in manufacturing environment using mcdm approach: a case study.- Reliability analysis of cng dispensing unit by lambda-tau approach.- Assessment of health risks among tractor operators due to whole body vibration.- Modelling, simulation and optimization of product flow in a multi-product manufacturing unit: a case study.- Critical success factors (CSF's) of TQM and its effect on overall business performance.-Benchmarking the interactions among drivers in supply chain collaboration.- Significance of electronic waste management for sustainable industrial production.- An exploratory study into financial supply chain management.
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: