Free shipping on orders over $99
Optimal Long-Term Operation of Electric Power Systems

Optimal Long-Term Operation of Electric Power Systems

by G.S. Christensen and S.A. Soliman
Paperback
Publication Date: 22/02/2012

Share This Book:

  $101.07
or 4 easy payments of $25.27 with
afterpay
This item qualifies your order for FREE DELIVERY
This book deals with a very important problem in power system planning for countries in which hydrogeneration accounts for the greatest part of the system power production. During the past thirty years many techniques have been developed to cope with the long-term operation of hydro reser voirs. These techniques have been discussed in a number of publications, but they have not until now been documented in book form. This book is intended as the foundation for a special graduate course dealing with aspects of electrical engineering, operational research, water resource research, and applied mathematics. It may also be used for self study by practicing personnel involved in the planning and operation of hydroelectric power systems for utilities, consulting groups, and government regulatory agencies. The book consists of eight chapters. Chapter 1 reviews the historical developments in the field, discusses briefly all techniques used to solve the problem, and summarizes the modeling of hydroplants for long-term operation studies. At the end of the chapter we present in detail an outline of the book.
ISBN:
9781468454956
9781468454956
Category:
Optimization
Format:
Paperback
Publication Date:
22-02-2012
Language:
English
Publisher:
Springer-Verlag New York Inc.
Country of origin:
United States
Pages:
324
Dimensions (mm):
229x152x17mm
Weight:
0.48kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Optimal Long-Term Operation of Electric Power Systems.