At the coast all is not what it seems. Decades of beachfront development have seen a variety of efforts to stabilize the shoreline to protect ill-placed beachfront property, both from shoreline erosion and from storm damage. Both of these problems become increasingly critical in a time of rising sea level. Many natural beaches are backed by sea walls, while others have been transformed by whole series of groynes, offshore breakwaters and a plethora of other schemes. Many recreational beaches are actually artificial replicas of the real thing, emplaced to protect badly placed infrastructure and maintained only through ongoing costly beach nourishment. However, all of these attempts to stabilize the shoreline are far from benign. Degradation and even complete loss of the all important recreational beach sometimes results from seawall emplacement. Increasingly, the choice of shoreline stabilization approach will depend upon plans for future response to rising seas which in many cases may involve retreat from the shoreline rather than holding the line. This book explores, through a series of case studies from around the globe, the pitfalls of shoreline stabilization and provides a ready reference for those with an interest in shoreline management. It is particularly timely in a time of global change.
- ISBN:
- 9789400741225
- 9789400741225
-
Category:
- Deltas
- Format:
- Hardback
- Publication Date:
-
05-06-2012
- Language:
- English
- Publisher:
- Springer
- Country of origin:
- Netherlands
- Pages:
- 334
- Dimensions (mm):
- 235x155x18mm
- Weight:
- 0.75kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: