Free shipping on orders over $99
Planning the Management, Operation, and Maintenance of Irrigation and Drainage Systems

Planning the Management, Operation, and Maintenance of Irrigation and Drainage Systems

A Guide for the Preparation of Strategies and Manuals (Revised Edition)

by World Bank
Paperback
Publication Date: 30/05/1998

Share This Book:

  $82.90
or 4 easy payments of $20.72 with
afterpay
World Bank Technical Paper No. 389. By the International Commission on Irrigation and Drainage. This paper is the revised edition of Technical Paper No. 99, written in 1989. It provides the basis for the preparation of manuals necessary for managers and staffs to perform needed activities at the proper time. The guide provides a comprehensive list of issues that should be addressed in operation and maintenance manuals for irrigation and drainage systems, and a listing of published materials and working papers which will assist in the formulation of plans for operation and maintenance. The paper serves as a valuable tool to help improve the performance of irrigation and drainage systems and to assist managers in developing and improving effective organizations to serve water consumers better.
ISBN:
9780821340677
9780821340677
Category:
Sanitary & municipal engineering
Format:
Paperback
Publication Date:
30-05-1998
Language:
English
Publisher:
World Bank Publications
Country of origin:
United States
Edition:
2nd Edition
Pages:
136
Dimensions (mm):
280x210x7mm
Weight:
0.32kg

This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Planning the Management.