Free shipping on orders over $99
Power Quality Enhancement Using Custom Power Devices

Power Quality Enhancement Using Custom Power Devices

by Gerard Ledwich and Arindam Ghosh
Hardback
Publication Date: 31/08/2002

Share This Book:

  $296.11
or 4 easy payments of $74.03 with
afterpay
This item qualifies your order for FREE DELIVERY
Power Quality Enhancement Using Custom Power Devices considers the structure, control and performance of series compensating DVR, the shunt DSTATCOM and the shunt with series UPQC for power quality improvement in electricity distribution.Also addressed are other power electronic devices for improving power quality in Solid State Transfer Switches and Fault Current Limiters. Applications for these technologies as they relate to compensating busses supplied by a weak line and for distributed generation connections in rural networks, are included. In depth treatment of inverters to achieve voltage support, voltage balancing, harmonic suppression and transient suppression in realistic network environments are also covered. New material on the potential for shunt and series compensation which emphasizes the importance of control design has been introduced.
ISBN:
9781402071805
9781402071805
Category:
Electrical engineering
Format:
Hardback
Publication Date:
31-08-2002
Language:
English
Publisher:
Springer-Verlag New York Inc.
Country of origin:
United States
Pages:
460
Dimensions (mm):
235x155x26mm
Weight:
1.88kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Power Quality Enhancement Using Custom Power Devices.