Free shipping on orders over $99
Power System Operation with Large Scale Stochastic Wind Power Integration

Power System Operation with Large Scale Stochastic Wind Power Integration

Interval Arithmetic Based Analysis and Optimization Methods

by Tao Ding
Hardback
Publication Date: 06/01/2017

Share This Book:

  $210.72
or 4 easy payments of $52.68 with
afterpay
This item qualifies your order for FREE DELIVERY
This book addresses the uncertainties of wind power modeled as interval numbers and assesses the physical modeling and methods for interval power flow, interval economic dispatch and interval robust economic dispatch. In particular, the optimization models are set up to address these topics and the state-of-the-art methods are employed to efficiently solve the proposed models. Several standard IEEE test systems as well as real-world large-scale Polish power systems have been tested to verify the effectiveness of the proposed models and methods. These methods can be further applied to other research fields that are involved with uncertainty.
ISBN:
9789811025600
9789811025600
Category:
Energy resources
Format:
Hardback
Publication Date:
06-01-2017
Publisher:
Springer Verlag, Singapore
Country of origin:
Singapore
Pages:
217
Dimensions (mm):
235x155x14mm
Weight:
4.79kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Power System Operation with Large Scale Stochastic Wind Power Integration.