Chapter 1: Stability analysis method of flat rod systems, based on forces approximations.- Chapter 2: Dynamic analysis of an elastic plate resting on a nonlinear fractional-order viscoelastic Pasternak foundation and subjected to moving load.- Chapter 3: Vibrations of a constructively nonlinear system with one-way connections.- Chapter 5: Study of the stress-strain state of short hollow core slabs depending on the width.- Chapter 6: Operation analysis of the main arch-cable-stayed systems when operating under unevenly distributed and asymmetrically working load.- Chapter 7: Development of flexible joint for beam-to-column abutment.- Chapter 8: Dynamic finite element analysis of plane frame with nonlinear multi freedom constraints subjected to harmonic load using Penalty function method.- Chapter 9: Influence of the chemical and mineralogical composition of dolomites of various deposits on the properties of MOC on its base.- Chapter 10: Filling of epoxy polymers as a factor of obtaining a multi-component composition with improved strength properties.- Chapter 11: Binding agents of autoclaved hardening based on metallurgical slags.- Chapter 12: Prospects for the use of fly ash from a thermal power plant of the Kaliningrad region in the construction industry.- Chapter 13: Influence of the quantity and time of hardening ash of thermal power plants formation of the structure and properties of cement stone.- Chapter 14: The study of the stress state in girders braced with carbon fiber.- Chapter 15: Getting gypsum mixes based on construction waste.- Chapter 16: Using Linear Programming for Builder Brigades Optimization.- Chapter 17: Magnesium oxide mixture technology for construction printer.- Chapter 18: Financing housing construction in the Russian Federation using escrow accounts.- Chapter 19: Geothermal power supply of buildings in harsh climatic conditions.- Chapter 20: Improving the methodology for predicting the destruction of the heat supply system in an accident.- Chapter 21: Experimental Study of Deformation of Soil Berms Retaining Pit Fence.
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: