6 3/4 X 9 3/5 in Preface * Notation * Part 1:A Strategic View; The Problem; Manufacturing Information for Design; Product Introduction Processes; A Process Selec tion Strategy; Part 2: Selecting Candidate Processes; Introduction; PRIM A Selection; Manufacturing Processes; Surface Engineering Processes; Ass embly Systems; Joining Processes; Process Information Maps (PRIMAs): Cas ting Processes; Sand Casting; Shell Moulding; Gravity Die Casting; Press ure Die Casting; Centrifugal Casting; Investment Casting; Ceramic Mould Casting; Plaster Mould Casting; Squeeze Casting; Plastic & Composite Pro cessing; Injection Moulding; Reaction Injection Moulding; Compression Mo ulding; Transfer Moulding; Vacuum Forming; Blow Moulding; Rotational Mou lding; Contact Moulding; Continuous Extrusion (Plastics); Forming Proces ses; Hot Forging; Rolling; Drawing; Cold Forming; Cold Heading; Swaging; Superplastic Forming; Sheet Metal Shearing; Sheet Metal Forming; Spinni ng; Powder Metallurgy; Continuous Extrusion (Metals); Machining Processe s; Turning and Boring; Milling; Planing and Shaping; Drilling Broaching; Reaming; Grinding; Honing; Lapping; Nontraditional Machining Processes;
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: