Diffusion Barrier Stack - 5 nm -3 nm -2 nm: . . . -. . . .: . . O. 21-lm Figure 2: Schematic representing a cross-sectional view of the topography that is encountered in the processing of integrated circuits. (Not to scale) these sub-micron sized features is depicted in Fig. 2. The role of the diffusion barrier is to prevent the diffusion of metallic ions into the interlayer dielectric (lLD). Depending on the technology, in particular the choice of the ILD and the metal interconnect, the diffusion barrier may be Ti, Ta, TiN, TaN, or a multi-layered structure of these materials. The adhesion of the barrier to the dielectric, the conformality of the barrier to the feature, the physical structure of the film, and the chemical composition of the film are key issues that are determined in part by the nature of the deposition process. Likewise, after the growth of the barrier, a conducting layer (the seed layer) is needed for subsequent filling of the trench by electrochemical deposition. Again, the growth process must be able to deposit a film that is continuous along the topography of the sub-micron sized features. Other factors of concern are the purity and the texture of the seed layer, as both of these factors influence the final resistivity of the metallic interconnect. Sputter-deposited coatings are also commonly employed for their electro-optical properties. For example, an electrochromic glazing is used to control the flux of light that is transmitted through a glazed material.
- ISBN:
- 9781461350637
- 9781461350637
-
Category:
- Industrial chemistry & manufacturing technologies
- Format:
- Paperback
- Publication Date:
-
12-09-2014
- Language:
- English
- Publisher:
- Springer
- Country of origin:
- United States
- Dimensions (mm):
- 235x155mm
- Weight:
- 0.27kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: