Non-destructive testing (NDT) techniques for the inspection of industrial structural components have to be qualified in respect to the minimum performance to be achieved. The qualification schemes relate to all aspects of the tests: procedure, equipment and personnel and the qualification of inspection should be codified in Standards. Such Standards are of two main types: those that detail the methods and procedures to be used and those that define the results which must be achieved. The European Network for Inspection Qualification (ENIQ) has as its aim the creation of a European collaboration for critical studies, assessment and qualification of inspection procedures for industrial structural components. The final goal is to support international Codes and Standards bodies via technical tools, expertise and demonstrative exercises that can be sponsored and managed at the European level.
- ISBN:
- 9780792332572
- 9780792332572
-
Category:
- Structural engineering
- Format:
- Hardback
- Publication Date:
-
31-12-1994
- Language:
- English
- Publisher:
- Springer
- Country of origin:
- Netherlands
- Pages:
- 540
- Dimensions (mm):
- 234x156x30mm
- Weight:
- 2.09kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: