This book analyzes the problems to be solved urgently in the development of launch vehicle control system. The techniques of redundant Inertial Measurement Unit (IMU) reconfiguration and trajectory replanning are proposed aiming at the inertial device failures and power system failures during flight of launch vehicles, respectively. It introduces the background of redundant IMU reconfiguration and trajectory replanning technologies and models of launch vehicle dynamics and redundant strap-down IMUs. The approaches for redundant strap-down IMU fault detection, reconfiguration and trajectory replanning are proposed, putting forward a prospect for the development of launch vehicle control system. The content of this book is concise and highly pragmatic. It could serve as a reference for engineers and researchers engaged in the analysis, design and verification of launch vehicle control systems and also as a reference for graduate students and senior undergraduates majoring in navigation, guidance and control.
- ISBN:
- 9789811946394
- 9789811946394
-
Category:
- Engineering: general
- Format:
- Paperback
- Publication Date:
-
01-09-2023
- Language:
- English
- Publisher:
- Springer
- Country of origin:
- Germany
- Dimensions (mm):
- 235x155mm
- Weight:
- 0.32kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: